The pattern behind most bad clearing stories
Talk to enough landowners and the bad stories rhyme: a crew that took a deposit and stopped answering, a job that was starting 'next Monday' for six straight weeks, or a walk-away after the growth was declared 'too thick.' None of that is bad luck. It's a set of avoidable hiring mistakes.
The mistakes, plainly
Accepting a phone quote for ground nobody has walked. Clearing is priced by machine time, and nobody can see stem density through a phone. A price given sight-unseen is either padded or about to grow.
Not asking who owns the machine. An outfit renting a mulcher by the week has a return date driving its schedule. Your job fits around the rental, not the other way around. An owner-operator's calendar is his own to keep.
Taking a verbal start date. If the start date isn't in writing, it isn't a commitment. It's a mood. Same for the price.
Leaving the finish undefined. 'Cleared' means different things. Agree on the ground: what stays, what goes, how fine the grind, what happens at the fence line. Settle it before the machine starts, not after.
Not agreeing on what happens at the end. A final walk-through together, before final payment, is where small misses get fixed. If a contractor won't commit to one, that tells you something.
What good looks like
A free on-site walk-through, a written price, a written start date, one operator on your job until it's done, and a walk of the finished ground together. That's not a high bar. It's the minimum, and you should hold anyone you hire to it, me included.